All-weather roads, drainage, public lighting — the basics that work, measured by km and hours.

The problem

Sawayajpur sits in the eastern sandy uplands of Hardoi, near the Gomti. KVK Hardoi documents "irregular rainfall and irrigation problems" in the district; groundnut (a kharif crop) is shrinking. Drainage in flood-prone villages is poor; paved roads exist but maintenance is patchy; many habitations are not on the all-weather network.

2027 — 100 days & first year

  • Pothole audit + repair of all paved roads (km-by-km)
  • GIS-mapped status of every village road published
  • Drainage survey of 5 flood-prone villages
  • Street-lighting audit in Nagar Panchayat wards

2030 — end of first term

  • All-weather connectivity to every village ≥500 population
  • 24×7 street lighting in all Nagar Panchayat wards
  • Public Wi-Fi at PHCs, schools, bus stands
  • Road density at district average

How we'll know it worked

All-weather road connectivity to every village ≥500 population. Drainage that survives the monsoon.